Bentivoglio, San Giovanni, Budrio (BO) - Italy
ENERGY EFFICIENCY INTERVENTIONS AND TECHNOLOGICAL UPGRADE IN HOSPITAL ENVIRONMENTS
Thermal savings and CO2 emissions cutting for the hospital of Bologna city. (Bentivoglio - San Giovanni - Budrio)
Nr. 3 LiBr absorption chillers powered with hot water at 90° C.
COOLING POWER INSTALLED: 600 KW
The hospital facility of Bologna required an important energy requalification intervention aimed at reducing the thermal energy consumption for the benefit of the environment.
Nowadays the selection of innovative technologies for the energy saving is one of the primary conditions to be respected during the feasibility study of each specific project.
Systema has designed and installed n.3 absorption units of 200 kW configured as external package, customized and completed with their proper sized accessories, such as boxes, circulation pumps, cooling towers, electrical panels and sanitation system.
The n.3 chillers are powered with hot water at 90°C and they produce chilled water for the air conditioning of the hospital environments.
Innovation and technology, a winning combination to guarantee comfort and efficiency in full respect of our planet.
© 2024 Systema S.p.A. radiant strips, gas radiators, gas absorbers, radiant tubes | Site map | Privacy & Cookie Policy
C.F. e P.Iva 02036480289 | R.E.A. di Padua n. 199339 | Share Capital € 1.500.000,00 i.v. | A Digital Project by Bizen